With the development of China's construction, there has been a shortage of masons for several years. Many young people are also reluctant to engage in this industry, resulting in a shortage of staff and increased labor costs. The technology of cement mortar spraying machine can well reduce the cost and solve the shortage of construction personnel. The use cost of cement mortar spraying machine and its advantages in actual engineering operations were compared.
Use of cement mortar spraying machine:
Before painting cement on the exterior wall, make arrangements for the use of machinery, tools, and personnel before the operation. The site requires a building whose structural body has been completed and inspected qualified, and scaffolding is installed in place before construction. Whether the connection between the window and the main body is firm, and the balcony and some pipes need to be left blank to be blocked. The protruding part of the wall needs to be leveled, and the safety inspector is in place. Quality supervisors are in place, ready to respond to problems during the construction process. Before large-area construction of external walls, small-area trial construction should be carried out first, and then large-scale construction should be carried out after passing the test.
Safety measures:
When working at height, be sure to check whether the scaffolding is strong, especially pay attention to work in windy weather and rain. Issues such as the scaffold board's unsteady and easily tilted head must be dealt with in time. First of all, we must ensure the width and safety of mortar when working on the scaffold. Work tools and materials should be kept stable, and they cannot be sloppyly placed. When the tower crane is put on the mortar, there must be a special personnel command, and if it encounters a strong wind above level 6, it must be stopped. The mortar machine and the cement mortar spraying machine must be operated and maintained by professionals. If you encounter problems with electrical equipment, seek professional electricians to deal with them in time, and strictly control the construction load of scaffolding. The connection parts of the scaffolding and the scaffolding can not be removed at will, and the safety standards and safety facilities on the scaffolding cannot be removed at will. In case of the need of construction, it should be dismantled only after approval by the person in charge of construction.
The long-term storage of the mortar spraying machine must be carried out at the following points:
(1) It should be placed in a dry room, if you must stay outdoors. You should choose a flat floor and planks and cover them after parking.
(2) Before long-term storage, it should be repaired, maintained and damaged. And clean it and keep it in good condition.
(3) Arrangements at the airport should ensure that any machinery entering and exiting is not affected by other machines.
(4) The mechanical fuel control rod should be placed in the idle position and the control rod is in the neutral position.
(5) Engine storage, releasing cooling water from the engine. Change the oil, the new oil is usually neutral. It will not corrode the metal parts of the engine, and the fuel tank is filled with diesel. To prevent the fuel tank from rusting, if conditions permit, preservatives should be added during shutdown. The engine should be started once a month to make the machine run a shorter distance. And the lubrication of each component should be used to make a new oil film to prevent rust, it should be noted. The cooling water should be filled before starting, and the cooling water should be completed at the end.
Want to know more details about the mortar spraying machine, feel free to leave us an online message! !