Operation Guide For Cement Plaster Spraying Machine

Date:2023-03-13     Label:

Cement Plaster Spraying Machine

Mortar Spraying Machine

Cement Mortar Sprayer

The cement plaster spraying machine has the combined operation function of pumping, bonding and spraying; it is suitable for the construction of ready-mixed dry-mixed mortars with different characteristics and different purposes; modular structure, simple disassembly, convenient movement and easy use; with optional control and adjustment functions , Realize different pressure, displacement and spraying speed; equipped with pressure protection device. So how to use better cement plaster spraying machine.

Operation guide for cement plaster spraying machine

1. Before starting each shift, press the hand oil pump several times to inject oil into the transmission part.

2. After connecting the power of the cement plaster spraying machine, first electric the main motor to check whether the rubber screw rotation direction is the same. If not, change the power phase line (this check should be done every time the power is reconnected).

3. Connect the delivery hose and nozzle of the cement mortar sprayer, add 5L of clean water to the hopper, start the motor to pump the clean water out, moisten the hopper, pump body and delivery hose, and stop after pumping out most of the water.

3. Connect the delivery hose and nozzle of the cement mortar sprayer, add 5L of clean water to the hopper, start the motor to pump the clean water out, moisten the hopper, pump body and delivery hose, and stop after pumping out most of the water.

4. Add putty or paint into the hopper to start spraying (should start the air compressor and open the air valve)

5. It is strictly forbidden to run idling when there is no material or water in the hopper.

6. After the work is completed, drain the remaining material in the hopper, and pour enough clean water into the hopper, clean the hopper, and start the pump, clean the hose and nozzle, until the pump is all clean water, so as to avoid the remaining material in the hose. Solidification, blocking the hose and nozzle.

+

+