Mortar spraying machine is a good helper for you to transport materials and plaster. When carrying out joint operations of conveying and spraying, construction time and labor can be greatly saved, and efficiency can be improved. The average efficiency of using mortar sprayer construction is about 4 times that of manual. In addition, the mortar spraying machine has good operation performance, high reliability during use, less floor dust, uniform cloth during spraying, high adhesion, and is not easy to fall off. Can greatly improve labor efficiency and reduce your labor costs.
The mortar spraying machine is specially used for spraying mortar and lime on the construction site. When it is used, it must strictly follow the operation regulations and at the same time strictly implement the prescribed safety measures.
1. Before the construction operation of the mortar spraying machine, workers must be informed of safety technology and safety education.
2. When constructing the working surface of the mortar spraying machine, attention must be paid to the setting and use of on-site electricity, and no wires or electrical boxes can be drawn at will. Irrelevant personnel are prohibited from using the electric facilities.
3. When the indoor plastering adopts scaffolding on high stools, the width should not be less than two (50cm) scaffoldings, the spacing should not be greater than 2m, no people should stand on it when moving the high stools, and no more than 2 operators. When the height exceeds 2m, the scaffolding shall be erected by the shelf worker.
4. The mortar spraying machine should be used by a dedicated person; the mortar machine body is installed smoothly and has good grounding protection.
5. Work at night or in a dark place, use safe voltage lighting below 36V.
6. Require construction personnel on all working surfaces to carry out civilized construction, and shall not randomly throw construction materials and construction waste.
7. Due to the narrow site and numerous construction types, construction personnel and mechanical transportation vehicles should be careful not to collide with the partition wall panels. The trolley must be stable indoors, and you must not turn sharply when turning.
8. After the daily construction of the mortar spraying machine is completed, the working surface should be cleaned, and the fragments should be cleaned and piled up, and transported from each floor to the determined storage point.
9. The person in charge of construction in each district must be responsible for the site civilization of the operation area and implement it to the people.
10. In case of strong wind and heavy rain, the operation should be stopped.